The engine is gently run in over a certain period of time in a special oil mixture. (No combustion, pure oil bath!)
After this procedure, the engine is ready to go and only needs to be run in for two tanks without shifting gears, after which it can be shut down immediately, piece by piece!
Of course, not all at once... we would then give it another 2-4 tanks until it is in its optimal operating range.
2-Speed
Responsible person according to GPSR
2-Speed GmbH, Gosenbacher Hütte 64, 57080 Siegen, Deutschland, sales@2-speed.de
